• |
11 Social areas throughout the frontstretch dubbed “Neighborhoods” each the size of a football field |
• |
101,500 brand new 20” – 21” frontstretch seats with backs and arm rests |
• |
5 expanded and redesigned fan entrances called injectors |
• |
17 elevators in the new venue |
• |
3 new concourse levels for fans that will span the frontstretch |
• |
Over 60 new trackside suites |
• |
40 escalators in the new venue (Tops the nation in number of outdoor venue escalators) |
• |
6,300 new jobs |
• |
300 Million in labor income |
• |
Over 85 million in new tax revenue |
• |
More than 2x the number of restrooms |
• |
3x the current number of concession and merchandise points of sale |
• |
Venue length = nearly 1 mile (designers had to compensate for the curvature of the earth) |
• |
Amount of steel used in DAYTONA Rising = 1% of annual U.S. Steel Output |
• |
Hundreds of club and loge seats (a new hospitality level will transition the hospitality experience from the old temporary chalet model to a permanent climate controlled high-end experience within the venue) |
For more information, visit our DAYTONA Rising page.